Perimeter lane closures, traffic pacing set for I-285/Ga. 400 project

Georgia Department of Transportation construction partners will close lanes on local roads, pace traffic for controlled blasting, and close expressway lanes and ramps for the ongoing reconstruction of the I-285/Ga. 400 interchange in the Perimeter area of North Fulton and DeKalb counties.
The work is "weather permitting" and scheduled for 9 p.m. to 5 a.m., according to GDOT. Information: https://bit.ly/2XfUdK0
Monday-Wednesday: Two left lanes of eastbound I-285 from Glenridge Drive to Ga. 400; two right lanes of eastbound I-285 from Ashford Dunwoody Road to Chamblee Dunwoody Road; and the ramps from eastbound I-285 to northbound Ga. 400, and from southbound Ga. 400 to westbound I-285.
Also, traffic pacing is planned on northbound Ga. 400 from Lenox Road to I-285; eastbound I-285 eastbound from Roswell Road to Ga. 400, and westbound I-285 from Ashford Dunwoody Road to Glenridge Drive.
Tuesday (overnight): One right lane of southbound Ga. 400 from Pitts Road to the North Springs MARTA station; and eastbound Spalding Drive over Ga. 400.
Tuesday-Thursday: Two right lanes of eastbound I-285 from Glenridge to Peachtree Dunwoody Road; and the ramp from northbound Ga. 400 to eastbound I-285.
Tuesday-Friday: southbound Peachtree Dunwoody Road from Hammond to Lake Hearn Drives.
