Georgia Department of Transportation construction partners will close lanes on local roads, pace traffic for controlled blasting, and close expressway lanes and ramps for the ongoing reconstruction of the I-285/Ga. 400 interchange in the Perimeter area of North Fulton and DeKalb counties.
The work is "weather permitting" and scheduled for 9 p.m. to 5 a.m., according to GDOT. Information: https://bit.ly/2XfUdK0
Monday-Wednesday: Two left lanes of eastbound I-285 from Glenridge Drive to Ga. 400; two right lanes of eastbound I-285 from Ashford Dunwoody Road to Chamblee Dunwoody Road; and the ramps from eastbound I-285 to northbound Ga. 400, and from southbound Ga. 400 to westbound I-285.
Also, traffic pacing is planned on northbound Ga. 400 from Lenox Road to I-285; eastbound I-285 eastbound from Roswell Road to Ga. 400, and westbound I-285 from Ashford Dunwoody Road to Glenridge Drive.
Tuesday (overnight): One right lane of southbound Ga. 400 from Pitts Road to the North Springs MARTA station; and eastbound Spalding Drive over Ga. 400.
Tuesday-Thursday: Two right lanes of eastbound I-285 from Glenridge to Peachtree Dunwoody Road; and the ramp from northbound Ga. 400 to eastbound I-285.
Tuesday-Friday: southbound Peachtree Dunwoody Road from Hammond to Lake Hearn Drives.
About the Author
The Latest
Featured